Peer review
Interpretations are checked by a second qualified reviewer before release [VERIFY: review steps and who signs off].
Methodology
Three stages take a project from raw measurements to a decision. Each records what was done, so the work can be checked.
01 / The three stages
The stages are the same for a single borehole and for a storage site. What changes is the amount of data and the number of iterations.
02 / Uncertainty
03 / Data and quality control
The table lists the checks applied to borehole data before interpretation [VERIFY: written QA procedure].
| Check | What is done | Record kept |
|---|---|---|
| Calibration | Tool response checked before and after each run | Calibration sheets with the data |
| Repeatability | A repeat section logged on every run | Main and repeat passes compared |
| Depth control | All runs matched to one reference log and a fixed datum | Depth shifts by interval |
| Corrections | Hole size and fluid corrections applied | Corrections and parameters listed |
| Core tie | Logs matched to core gamma and plug data where core exists | Calibration cross-plots |
| Audit trail | Interpretation parameters and software versions recorded | Parameter table in the report |
04 / Review and independence
Interpretations are checked by a second qualified reviewer before release [VERIFY: review steps and who signs off].
DeepSink is paid for the analysis, not the outcome. A finding that the evidence does not support a project is reported as plainly as one that does.
Client data is held under access control and is not shared or reused without written consent [VERIFY: storage and retention].
05 / Next step
Tell us what you hold and what you need to decide. We will set out what the data can and cannot establish.