Borehole Logging & Interpretation
Wireline logging, petrophysics and core-log integration that turn a borehole into a calibrated record of the formations it crosses.
Service 04
Independent technical evidence for investment decisions and renewable infrastructure: what the subsurface supports, and how sure that is.
01 / The problem
Capital for climate infrastructure is committed on technical claims that most investment teams cannot test themselves: that a formation will store what the model says, that a well will produce, that a monitoring plan will detect a problem. An independent view of those claims, with the uncertainty stated, is what turns a technical report into evidence a committee can rely on.
02 / Approach
03 / Technical evidence for investment
Due diligence is written for two readers: the technical adviser who will check the method, and the committee that needs the conclusion.
04 / Renewable infrastructure
Subsurface input to renewable energy projects, including geothermal wells integrated with carbon management [VERIFY: scope of infrastructure work offered].
05 / Deliverables
Each engagement ends with documents and data that can be filed, checked and reused.
06 / Tools and data
| Category | What is used |
|---|---|
| Review | Structured checklists for data quality, method and assumptions [VERIFY: internal procedure] |
| Independent analysis | Log interpretation, capacity estimation and uncertainty analysis; see the other three services |
| Data | The sponsor's data room: well data, models, technical reports and monitoring plans |
Source: Tool types and software categories only. Named products are added once confirmed by the owner.
07 / Sample figure
| Time | P90, low (Mt CO2) | P50, mid (Mt CO2) | P10, high (Mt CO2) |
|---|---|---|---|
| Year 5 | 2.0 | 3.1 | 4.7 |
| Year 10 | 3.9 | 5.9 | 8.9 |
| Year 20 | 6.5 | 10.0 | 15.0 |
| Year 30 | 6.5 | 10.0 | 15.0 |
Source: Illustrative values, not project data.
08 / Related case study
Case studies are published only with the client's agreement. Entries marked as placeholders show the structure, not a real project [VERIFY].
All projects09 / Questions
For whoever commissions the review, with any other interest in the project declared before work starts [VERIFY: conflict-of-interest policy].
Yes, on the reliance terms set out in the engagement letter [VERIFY: reliance and liability terms].
Then the report says so. A finding that the evidence does not yet support the claim is a legitimate and useful result.
10 / Other services
Wireline logging, petrophysics and core-log integration that turn a borehole into a calibrated record of the formations it crosses.
Screening, monitoring design and technical evaluation for CO2 storage, stated with the uncertainty a regulator or investor needs to see.
Resource evaluation for groundwater, basalt and geothermal wells, built on logged and tested data rather than surface inference alone.
Courses and curricula in borehole logging, interpretation and carbon storage, built so that agency, industry and university teams can do the work themselves.
11 / Request a proposal
Tell us the decision the work has to support, the site or data you have, and any deadline.